NASA Logo, National Aeronautics and Space Administration

National Aeronautics and Space Administration

Goddard Space Flight Center

Astrophysics Science Division | Sciences and Exploration

This website is kept for archival purposes only and is no longer updated.

Skip Navigation
  :::
>
Mission Critical Multi-Media Gallery Hubble News Mission Updates Launch Info

  Mission Updates :: Late March

Home
Mission Updates
Mission Chronicles
Where Is Hubble Now?
Goddard Space Flight Center
Hubble Project - Code S
Excerpts from Weekly Report


Fri | Mar. 29, 2002
The third week of HST Servicing Mission Observatory Verification (SMOV) activities were nominal. 

Final alignment and focusing of the Advanced Camera for Surveys (ACS) is almost complete, and this will enable early release observations to be conducted next week as planned. 

Cooling of the Near Infrared Camera/Multi-Object Spectrometer (NICMOS) continued with the NICMOS Cooling System (NCS).  The NICMOS Main Electronics Box (MEB) was powered down in order to improve the rate of cooling, which has continued to slow as the NICMOS and NCS temperatures continue to fall. 

Planned science observations were conducted using the Wide Field/Planetary Camera 2, Space Telescope Imaging Spectrograph (CCD), and Fine Guidance Sensor 1.  All observatory subsystem performance was nominal during this period. 

At KSC, the three carriers and Flight Support System (FSS) were removed from the canister at the Vertical Processing facility.  The carriers, FSS, Crew Aids and Tools, and GSE are being prepared for shipment back to Goddard.  Reaction Wheel Assembly SN1008 (the RWA removed during the mission) and the two Rate Sensor Units that were flown were received back at Goddard.

First astronomy pictures from ACS are tentatively scheduled for release in May.

Latest ::
Goto hubble.nasa.gov
Post-Mission ::
Late Apr
Mid Apr
Early Apr
Late Mar
Mission ::
Mar 12
Mar 11
Mar 10
Mar 9
EVA 5 : Mar 8
EVA 4 : Mar 7
EVA 3 : Mar 6
EVA 2 : Mar 5
EVA 1 : Mar 4
Mar 3
Mar 2
Mar 1
Pre-launch ::
Feb Week 4
Feb Week 3
Feb Week 2
Feb Week 1
Preparation ::
Late Jan
Mid Jan
Early Jan
Late Dec
Mid Dec
Early Dec
Late Nov
Mid Nov
Early Nov
Late Oct
Mid Oct
Early Oct
 
 
 
Glossary | FAQ | Links
| Page Last Updated: March 28, 2012 |
Links FAQ Glossary Home