David Gregory
Physical Science Laboratory
Currently transitioning from NSBF to NASA WFF
Present Position: ULDB Mission Operations Manager, NASA Wallops
Responsible for implementation of mission and operations planning in support of the Ultra Long Duration Balloon project to include launch support, ground support telemetry systems, and mission planning to include trajectory forecast & analysis.
Previous:
1) 1992 - February 1988
Long Duration Balloon Group Supervisor
National Scientific Balloon Facility
Palestine, Texas
Supervised planning and execution of LDB flight systems support for the NASA Long Duration Balloon program after it's phase-in as a steady-state operation in 1992.
2) 1989 - 1992
Long Duration Balloon Development Team
Physical Science Laboratory and NSBF
Represented mission & operations in support for the LDB development program.
3) 1987 - 1992
Projects Engineer for Support Engineering Group
National Scientific Balloon Facility
Palestine, Texas
4) 1984 - 1987
Manager of Operations Electronics Group
National Scientific Balloon Facility
Palestine, Texas
5) Transmission Design Engineer for
Terrestrial Microwave Systems Group
GTE Sprint
Las Colinas, Texas


